What this covers
Installing stock and semi-custom framed cabinets (Hampton Bay, KraftMaid, American Woodmark, Diamond) and noting where frameless lines (Hampton Bay Designer Series, IKEA SEKTION) differ.
Tools & materials
- 4-ft and 2-ft levels, laser level (preferred for long runs)
- Stud finder, pencil, blue tape
- Drill/driver, 7/32" and countersink bits
- #8 × 2-1/2" trim-head screws (face-frame joining), #10 × 2-1/2" washer-head screws (wall cabinets to studs)
- Clamps (face-frame clamps or quick-grips)
- Shims (cedar), scribe tool or compass
- Ledger board (1×3 or 1×4) + screws for temporary support
- Toe-kick stock (ordered separately on stock lines — verify it's on site)
- Fillers, scribe molding, crown per the design packet
- Jigsaw (sink-base plumbing cutouts), hole saw set
Before you start
- Verify the design packet against the room. Check every cabinet size, filler, and appliance opening against actual wall measurements. Semi-custom orders (KraftMaid, Diamond Express/custom) have more odd sizes — catch errors now, not mid-hang.
- Confirm all material is on site: cabinets, toe-kick stock, fillers, moldings, screws, shims. Stock lines do not include toe-kick material.
- Pull all doors and drawers before lifting uppers (KraftMaid SureMount and most clip-on hinges are toolless — pop them off).
- Find and mark every stud in the cabinet zone. Wall cabinets live or die by stud attachment.
Layout
- Find the highest point of the floor in the cabinet area (laser or long level).
- Mark the base cabinet top line at 34-1/2" above the highest point (standard finished counter height is 36" with 1-1/2" countertop).
- Mark the wall cabinet bottom line at 54" above the highest point (18" backsplash gap above 36" counter).
- Mark the wall cabinet top line (54" + cabinet height, typically 30"/36"/42").
- Snap level lines. Verify level in both directions at the starting corner.
Hanging wall cabinets
- Screw a temporary ledger board level at the 54" line to rest cabinets on.
- Start in the corner (or at the most visible end if no corner). The first cabinet must be dead level and plumb in both directions — every cabinet after it references this one.
- Set the cabinet on the ledger, shim behind as needed, and drive minimum 4 screws into studs (#10 × 2-1/2" washer-head; American Woodmark spec: 7/32" pilot through top and bottom hanging rails, 3/4" from rail edges, screws at least 1" into the stud). On cabinets over 15" wide, 4 screws is the floor, not the ceiling.
- Never use drywall anchors alone for uppers. (Hampton Bay had a 2022 CPSC recall for wall cabinets detaching — studs, always.)
- Set the next cabinet: clamp face frames flush, drill and join with #8 × 2-1/2" screws through the face frames, then screw to studs. Leave wall screws slightly loose until the run is clamped and joined, then tighten.
- Sink-base back panels: field-cut for plumbing with a jigsaw before hanging. Measure twice — the panel is 3/8" and unforgiving.
Setting base cabinets
- Start in the corner. Level front-to-back and side-to-side with shims; the first cabinet is the reference.
- Clamp face frames, join with #8 × 2-1/2" screws, screw backs to studs.
- Blind corner cabinets: verify the pull-out or blind clearance per the design; Diamond SCR corner bases need a field-installed countertop support (1×2 or 1×3 screwed to studs on both corner walls).
- Install toe-kick (glue + finish nails) after bases are set and leveled.
Fillers, scribes & moldings
- Fillers must be pre-drilled and screwed into position (American Woodmark manual) — don't rely on pin nails alone.
- Scribe fillers and end panels to out-of-plumb walls with a compass/scribe tool; belt-sand or plane to the line.
- Frameless lines (Hampton Bay Designer, IKEA): leveling tolerance is tighter — there's no face frame to absorb error. Take the extra time.
- Crown: keep molding support strips on hand for full-overlay crown installs.
Doors, drawers & hardware
- Rehang doors; adjust 6-way European hinges (height, depth, side-to-side) until reveals are even.
- Install drawer glides/boxes per manufacturer; test every drawer for smooth full-extension close.
- Install knobs/pulls last (see Cabinet Hardware guide for hole-spacing standards).
Brand quirks — quick reference
| Brand | Watch for |
|---|---|
| Hampton Bay (stock) | Double-door uppers have no center stile — plan fillers accordingly; toe kick ordered separately; framed vs frameless series install differently |
| KraftMaid | SureMount hinges pop off toolless — strip doors before lifting; verify semi-custom design packet carefully |
| American Woodmark | Drill 7/32" pilots through hanging rails; blind-corner door is reversible; first cabinet must be dead level |
| Diamond | #10 washer-head screws into studs only — never sheetrock screws; don't cut cabinet backs (voids warranty); Express + custom can't share a PO |
| IKEA SEKTION | Steel suspension rail system — rail must be dead level; cabinets slide on rail then get clamped into a rigid run; budget a day for flat-pack assembly |
Common mistakes
- Hanging uppers on drywall anchors instead of studs.
- Not verifying the design packet — wrong filler sizes discovered mid-install.
- Setting the first cabinet "close enough" to level — error compounds down the run.
- Forgetting toe-kick stock wasn't included with stock cabinets.
- Cutting a Diamond cabinet back to clear a pipe — warranty void; re-plan instead.
- Pin-nailing fillers instead of screwing them.
Final check
- Every wall cabinet: 4+ screws in studs.
- All doors/drawers open, close, and soft-close without rubbing.
- Reveals even across the run.
- Toe kick installed, fillers scribed tight, jobsite broom-clean.
Rather have a pro handle it?